Protecting Work Spaces During Demolition
10/28/2021 (Permalink)
This picture was taken at a large distribution center for a well-known company. They could not afford to close the facility but needed to complete a messy demolition while protecting the unaffected areas. The existing floors needed to be scraped and the concrete sanded so a new floor could be installed. This is a very messy and dusty process that was beyond the scope of their flooring contractor.
SERVPRO created a special containment zone with positive pressure ventilation to prevent the dust from entering the HVAC system and being spread throughout the rest of the building. Air filtration systems were used during the demolition to clean the air within the work zone. Once demolition was complete, the SERVPRO team cleaned all of the equipment and surfaces so that reconstruction and installation of the new floor could be completed.
Having the expertise, the right equipment, and the resources to handle a large commercial job is what makes SERVPRO the ideal contractor for large commercial jobs.