Condo Kitchen Repaired
This condo kitchen suffered water damage which leaked from the unit above. The entire floor, which was a glued engineered wood flooring material, needed to be removed and had to be completely replaced. After the remediation was completed, our renovation team came in and patched up the sub flooring so new, upgraded flooring could be installed. The ceiling also had to be sheet rocked and painted. After the new flooring was installed and the kitchen painted, it looked brand new, and the owner was thrilled with the result. The owner was very happy that SERVPRO of Eatontown/Long Branch was able to work on all phases of the project, eliminating the need to hire more than one company for the job.